If everyone here wrote to that agency I can tell you NOTHING would be done. If wrexham.com were to lead a campaign on twitter and face-book and local forums, and raised it with BBC wales once it had gained enough speed I’m sure something would be done, it’s a matter of creating embarrassment for the agency and the council.
It’s not like money was not spend on that road, it was built over mine shafts and all sorts which were plugged up and such like, it took some work, it’s an investment that is not being looked after (the incident with the faulty tarmac last time it was surfaced etc, that’s why it had to be done twice), shows cost cutting, yes this time it was the contractor not the council / highways etc. but even the double resurface work didn’t fix this swimming pool just prior to junc 4 north. there’s a small one junc 3 south,
I’ve never known a major trunk road like this! (in the uk)